Page Loading... please wait!


This message not going away?
Ensure Javascript is on and click the box
Unregistered? Register for a user account. Home :: Downloads :: Submit News :: Reviews :: FAQ   

Posted News by Category


Active Categories


Contact Information

Click here for contact information for agency, FMC and CIG personnel.

Archived Stories

Older articles

Login







 Log in Problems?
 New User? Sign Up!

Adobe Reader


Documents for downloading are in pdf format. To download and install a free Adobe reader click here.

Technical Terms

For definitions of technical terms used on this site, click here.

Middleport Community

Middleport Community Web site

Village of Middleport


NYS DEC

NY State DEC for Middleport

Information from

FMC

Issues related to the RCRA process
On February 4, 2015, the DEC and DOH presented the results from the additional soil sampling performed on the school property in Middleport last August to the Roy-Hart school board. The findings show that most all the school property except for the football field previously remediated should be cleaned up to attain the state agency goal of 20 PPM maximum of soil arsenic. This includes a couple of courtyards.

Sample points were spread over a 100 by 100 foot grid. There were 109 locations where multiple samples were taken at different depths totaling 604 samples in all. Of the 109 locations, 87 had arsenic levels above 20 PPM with the maximum being 95 PPM.

The DEC proposes excavating most areas to a one foot depth but there are some areas that will need to be dug 18 and 24 inches deep. It may be necessary to go deeper in some areas depending on additional sampling during excavation. Further sampling will be performed to determine if the soil under the parking lots is contaminated to the degree requiring remediation.

The DEC would like to begin this summer. There will probably be three phases with the first phase remediating the area known as the field hockey field located behind the junior high school in the south east section of the school property.

The schedule is to finalize the design for the remediation/reconstruction by May, mobilize the construction crews by June and begin excavation mid June. It was hoped that Phase one could be completed with reconstruction and new turf by the beginning of the school year.

A fence will surround the work area to keep people out and away from exposed soil.

To gain access to the work area a roadway will be constructed along the eastern side of the school property. A truck staging area will be built near the work site but the roadway will be wide enough to support additional staging as necessary. Smaller trucks will be used for hauling soil in and out (no double tandem trucks). Water trucks will periodically spray down the area to reduce dust. Dust monitoring devices will be strategically placed around the area.

In order to meet the construction schedule the school board must make a decision whether to have phase one started or not by March 4th. The target for completion of the entire school property is sometime between 2016 and 2018.
DEC presents plan to Royalton-Hartland School Board of Education | Log-in or register a new user account | 0 Comments
Comments are statements made by the person that posted them.
They do not necessarily represent the opinions of the site editor.

Make a Comment or Ask a Question

Want to make a comment on this site or ask the MCIG a question? Click the blue button to send an email with your comment/question. If applicable, your commemt will be posted on the home page or in the Share an Opinion section.

Next Meeting Date


There are no plans for a meeting at this time.

All meetings run from 5:30 to 8:00 p.m. at the Masonic Lodge, 20 Main St. in the Village. All Middleport residents and property owners are welcome to stop by anytime while we are meeting.


Meeting Notes & Agendas

Download CIG meeting notes and agendas from  2006 to the present here.

CIG Mission Statement

To download a copy of the CIG's Mission Statement click here.

The CIG Brochure

To download the CIG brochure in pdf format just click this link.

Online

There are 5 unlogged users and 0 registered users online.

You can log-in or register for a user account here.